Green Dolphin Adventures - January/February 2024
Mar 06, 2024

Green Dolphin’s work was moving along well until there was a storm that put a pause on the work. Green Dolphin went over to South River, under her own power, and anchored there for a couple of days until the winds died down to normal. Once back at her slip, the work continued. First on the list has been work on the windlass. Her anchors were ready, but the windlass was not functional. That has almost been remedied. We are waiting on some specialty hardware for proper installation. All the bilge area bulkheads are finished, the tub is back in the head area, the refrigerator in back in the galley area, and the subfloor has been epoxied and is in place. The next two jobs will be electrical systems and plumbing.